October, 30/2009
Open Space Design Principles
- Link actively with existing open space and pedestrian road
- Make a full use of existing landscape factors
- Ensure amenity by distributing mid-size open space in every zone
- Ensure safe and multi-usable open space
October, 30/2009
Street Design Principles
- Road system is classified to 3 types by width
- Gate road is planned to main entrance of the region (29.2M)
- Connecting road of waterfront park and town core (24.1M)
- Crossroad functions as Community street (22.6M)
November, 02/2007
From 2006 to 2010 is the first phase of development with the area of 350 hectares including main area of the Core Area and all the Eastern Residential area. The catalyst projects and buildings for this phase are: